您的网页浏览器已过期!

更新您的浏览器,以提高安全性和舒适性,并获得访问本网站的最佳体验。

Your web browser is out-of-date!

Update your browser for more security, comfort and the best experience on this site.
更新浏览器 Update browser 忽略 Ignore

Super high-rise top mold system

building machine in air, technology "unicorn", and intelligent construction robot industry pacemaker With the formwork system and high load carrying capacity, it is core tube construction mainstream construction technology of domestic super high-rise buildings over above 400m.

The super high-rise top mold system adopts the long-stroke (6m stroke) and large-tonnage (could reach 600t) hydraulic cylinder and supporting pillar and box beam as the jacking and supporting system of formwork. The upper steel truss platform is jacked at the low position (or preset steel component) of the cave mouth reserved by core tube to drive the template and hanging parts rising. It is a kind of construction process completing vertical concrete structure construction. Super high-rise top mold system is the super high-rise building core tube construction safety protection system with independent intellectual property rights and all-metal construction independently researched and developed by TOSUN Safety Technology.